- 1. Project Status - Report by President
-
- The corporation was Featured in a local Reedsburg township newspaper. Seed TEAM support continues
with scallion, spinach, asparagus and peas harvested. Working visit from hub Toni to assist with harvesting
anticipated in August. Request from TV Film Clip received, with serious intention to put clip on Public
Access TV! Short Wave Radio web classes updated but antenna installation and Storm Shelter installation
dependent upon scheduling contractors. Hydroponics doing well in Cycle 1 and watercress gift received
from Mary. Aquaponics plumbing in hand and setup in process, to be stocked in September. Four Worm
Beds in operation, stocked with addition of red wigglers, and development of earthworm recipes underway.
Video Servers being shipped from Silicon Valley.
-
- 2. Acceptance of Designated $1,500 Gift - Vote or NOT
-
- Member Brent Freemont has donated $1,500 with the Designation that this be used to pay for the web site
costs, specifically stating that a tangental support of ZetaTalk should not be considered a problem. Web
serving costs $50/month and rising (due to MB increases) and domain name registration for the 3 ZetaTalk
domains is $105 yearly. The President is requesting that this gift be designated to pay for years 2000 and
2001, anticipated to be $1,410 at a minimum.
-
- 3. Treasurer's Quarterly Report - Report by Treasurer
-
- As required in the Bylaws, the Treasurer's quarterly Quarterly Report, which reflects the balance as of the
end of June, 2000. As of this board meeting there is $16,623 cash in the bank, which includes a $1,500
deposit (Agenda Item 2) and checks written to cover $836 in expenses waiting to be approved (Agenda Item
4). Assuming the board approves these expenses and the discretionary account increases that are requested,
then a total of $18,694 will have been authorized by the board to be covered by the $16,623 in available
funds. However, $2,295 in authorized expenditures is unlikely to be called upon during this year - $800
discretionary for UNIX Servers (coming in way under budget), $700 for a tiller trailer (both seed sites are
1/2 mile apart this year), and $795 for web support in 2001. An estimated $16,399 is required during this
year, 2000, to complete the Short Wave antenna and Storm Shelter projects, and to support the ongoing TV
Clip, Seed TEAM support, Worm Beds, Hydro and Aquaponics, and UNIX Server projects - leaving $225
in reserve. The corporation has been promised a very generous donation in December, which would double
the amount received already this year ($45,000), so the President is recommending proceeding apace to
continue and complete ongoing projects.
-
- 4. Approval of Project Support Funding - Vote or NOT
-
- During the June, 2000 Board Meeting disbursement discussion, a couple items were tabled for lack of
information. Covering nonprofit assets by insurace, to include liability, was estimated at $500/yr. This has
been secured, from American Family, for $265/yr., policy in force as of July 1, 2000. The President is
requesting reimbursement be approved. Several ongoing projects have exceeded their discretionary
allowance, and the President, as site manager, is requesting these Support allowances be increased, a total
increase of $1,388.
-
- 5. Midyear Election for Director Seats - Vote or NOT
-
- Clipper's resignation from the Board has reduced the Board to 10 of 12 seats. The Bylaws allow a mid-year
Election if the Board approves. A qualified new member, Sol, has in essence been Nominated, the
nomination seconded, and accepted. During this tt-inc@eGroups.com Discussion, the issue of director
qualifications arose, with a potential change (in italics) to the existing Director Powers Bylaws posted for
review and discussion. The President is recommending that this Bylaw change to adopted to require stating
a candidate's qualifications, that a mid-year election be approved by the Board to fill the 2 open seats, that a
brief 2 week nomination period for additional candidates be held, to be followed immediately by a 2 week
election period.
-
- 6. Michel as Director - Vote or NOT
-
- As a result of Comments made during the June, 2000 Board Meeting by Michel Davelaar, Ron Darby, the
Treasurer, has called for Michel's resignation. Reasons given in essence were a lack of understanding of the
corporation as a Public Benefit corporation, implying that distributing donations among the board members
is a proper focus of the corporation. In accordance with the Bylaws covering such a situation, this matter
must be duly considered by the Board. The President will open the floor to discussion, a second to the
motion, and a vote to place the matter before the membership if called for.
-
- 7. Project Focus - Policy Discussion
-
- The discussion following the June, 2000 Board Meeting included ways and means to guard against grant
proposals proferred with the primary purpose of building or stocking survival sites, rather than offering a
public benefit such as solution set development, educational material, or classes. As funding increases and
panic over crop shortages likewise increases, the corporation could be seen as an easy touch. Maximizing
return should be a guideline, so that an existing site is used vs the purchase of a site, existing prototypes
used vs building a prototype, and volunteer rather than hired workers used when qualified. Projects should
be evaluated based on the educational value or public service they provide. An asset list should continue to
be maintained so assets owned by the corporation can be moved to another site. Site checks and project
audits, as authorized in the Bylaws, should be conducted. During the discussion, the President suggested a
January 1, 2003 asset dissolution Bylaw change, to remove site building or stocking as a focus from
projects. The Treasurer has suggested another approach, to require principals, and even seed growers, to
sign a contact specifying the product or service to be delivered, and the time frame, with Breach of Contract
pursuit open to the corporation if there is a failure to deliver.